Skip to main content

Celonis Product Documentation

How do I set up a Schedule?
Prerequisites
  1. Decide on which Data Job should be scheduled.

  2. Decide on whether you want to load data fully each time the schedule is executed or whether it should be a delta load.

  3. Decide on the frequency of the load.

Steps
  1. Create a schedule

  2. Define the mode: full or delta load

  3. Define the frequency by using either one of the predefined categories like weekly or choose "custom cron"

  4. Add the data jobs into the schedule and order them so that their sequence makes sense

More details can be found in the documentation for scheduling.